Façade & access scaffolding
System and tube-and-clamp scaffolds for new build, recladding and restoration. Engineered drawings included above 40 ft.
Most requestedScaffolding · Access · Temporary works
Upright designs, delivers and erects certified façade and access scaffolding for construction, restoration and industry — on site in as little as 48 hours, inspected weekly, dismantled on schedule. So your crew can get on with the build.
What we do
From the first lift to the final strike, one crew owns the structure. Design, delivery, erection, inspection and dismantle — no subcontractors in between.
System and tube-and-clamp scaffolds for new build, recladding and restoration. Engineered drawings included above 40 ft.
Most requestedPublic-access stair towers, loading bays and material hoists that keep every trade moving between floors.
Rental or supplyPropping, needling and temporary roofs designed by our in-house engineers, with stamped calcs in the quote.
EngineeredTagged, logged and re-inspected every seven days. Photo reports land in your inbox the same afternoon.
IncludedRecent work
A few of the 1,200+ structures we've put up across the Northeast — from heritage brickwork to distribution roofs.
Baltimore, MD · Façade restoration
Providence, RI · Brickwork & window replacement
Newark, NJ · Roof access & shoring
Safety
A stopped site costs more than any scaffold. Every Upright structure is signed off by a Competent Person before handover and re-inspected every seven days — or after any storm, strike or alteration.
OSHA-trained supervisors erect, alter and dismantle. Nobody else touches the structure.
Stamped drawings and load calculations by our in-house engineers, included in the quote.
Tagged, logged and photographed. Reports reach the site manager the same day.
Fully insured, working to OSHA 1926 Subpart L and ANSI/ASSP A10.8. Certificates on request.
Get a quote
Send the address, the height and the trades that need access. A project manager calls back within one business day with a price and a start date.